What We Do

Services

Every part of a deck project, from footings to final board.

HomeServices

Everything we take on

Every job below is one we do ourselves across Shoreline.

Deck Installation

We frame new decks from the footings up, sizing beams and joists to span and load, not just to whatever lumber was on the truck. Ledger boards get flashed properly where they meet the house, because that's the spot most decks start rotting from.

Deck Repair

Soft spots, bouncy sections and rails that move usually trace back to a rotted joist or a ledger board pulling away from the house. We open up the deck, replace what's failed and check the rest of the frame while we're in there.

Deck Staining & Sealing

Cedar and pressure-treated pine both require a fresh coat of stain every two to three years out here, sooner if the deck gets full sun and driving rain. We pressure wash, let the wood dry out fully, then apply stain and sealant so water sheds instead of soaking in.

Custom Deck Design

Multi-level decks, built-in bench seating, angled stair runs, whatever the yard actually calls for instead of a square box off the back door. We draw it out and walk through the layout with you before any lumber gets cut.

Deck Replacement

Sometimes the footings are still good and only the framing and decking need to go, sometimes the whole thing has to come out. We tear out down to whatever's still sound and rebuild from there, upgrading railing and hardware to current code along the way.

Composite Decking

Trex, TimberTech and similar boards cost more up front but skip the restaining and the rot that pressure-treated pine deals with. We still frame the substructure in real lumber and space the boards for drainage the way any deck should be built.

Deck Railing Installation

Baluster spacing has to stay under four inches and top rails have to hold a couple hundred pounds of lateral load, code isn't optional here. We install wood, cable and glass rail systems and make sure posts are bolted into the frame, not just screwed to the fascia.

Deck Framing & Structural Repair

This is the part nobody sees once the boards go down, and it's the part that decides whether the deck is still solid in ten years. We check beam sizing, joist hangers, post footings and ledger attachment, and fix whatever's undersized or rotted before it becomes a bigger problem.

Deck Board Replacement

If the frame underneath is still sound, you don't need a full rebuild just because a few boards cupped or split. We pull the bad boards, match the material as close as we can, and replace them without disturbing the rest of the deck.

Covered Decks & Roof Structures

A lot of decks around here need some kind of cover just to get used more than three months a year. We build pergolas and solid roof structures over existing or new decks, tied into the framing so the extra weight and wind load are actually accounted for.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Shoreline, WA

Deck work available throughout the greater Shoreline area.

Shoreline, WA
Seattle, WA
Bellevue, WA
Kent, WA
Everett, WA
Renton, WA
Kirkland, WA
Redmond, WA
Lynnwood, WA
Edmonds, WA
Bothell, WA
Mountlake Terrace, WA
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit to build a deck?
Most decks attached to a house, or built higher than 30 inches off the ground, require a building permit in Washington state. Permit review covers footing depth, guard rail height and stair specifications as part of the deck construction process.
How long does it take to build a deck?
A standard deck installation typically takes one to two weeks from footings to final decking, depending on size and design. Multi-level decks, covered structures or custom railing add time to that schedule.
Can deck work be done on a tighter budget?
Pressure-treated pine costs less than composite or cedar decking and can be phased, with railing or staining added as a later project. Setting a budget before design work starts lets material choices get matched to it early.
Do you guarantee your deck work?
Workmanship on deck framing, decking and railing is typically covered under warranty, separate from manufacturer warranties on composite decking and hardware. Warranty details get spelled out in the written quote for a deck project.
Who do I talk to during the project, day to day?
One point of contact usually handles scheduling and questions for the length of a deck project, rather than passing calls between different people. That makes it easier to get a quick answer if a detail requires adjusting mid-build.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite brands like Trex and TimberTech are standard options for deck installation. Upkeep differs by material: pressure-treated pine requires regular staining, composite doesn't, and cedar falls in between.
Can I still use my yard while the deck is being built?
Most of a yard stays usable during deck construction, though the immediate work area has to stay clear for safety and material storage. Keeping pets and kids away from the site is recommended while framing and cutting are underway.
How should I prepare before deck construction starts?
Clearing furniture, planters and grills off an existing deck or the build area helps the first day of construction move faster. Confirming access for equipment and material delivery, through a gate or driveway, is worth doing ahead of time.
What happens if you find rot or a structural problem once the old deck comes off?
Hidden rot in ledger boards, posts or footings sometimes only shows up after old decking gets removed. Any additional repair required gets flagged and priced before work continues, not added to a bill afterward without warning.
How do I maintain a deck after it's finished?
Wood decking typically requires restaining every two to three years, along with a yearly check for loose fasteners or soft boards. Composite decking mainly requires regular washing to clear algae and debris from the board grooves, since it doesn't take stain.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (206) 401-8427